Estancia Winery, Soledad, CA
Estancia is a
60,000 sq.ft. concrete Tilt-up Barrel building with precast-columns,
beams and double tee's. Also included in the work done for
Estancia Estates is a 13,230sf two-story administration building,
33,000sq covered tank farm and associated elevated aluminum
platforms and catwalks.
|
|
| |
 |
|
 |
Calistoga Cellars
A new two-story wood framed boutique winery and office building
located in Calistoga CA.
|
|
| |
 |
|
 |
Deerfield Ranch Winery, Kenwood
A two-phase project consisting of a 3,000sf bottling
and fermentation building and an 8,000sf main winery building
with underground storage. The main winery building consists
of a new 5,200sf winery building with a 1,600sf mezzanine and
a 1,200sf covered crush pad above a full depth basement. The
stick-framed roof of the building incorporates large skylights
and architectural trusses. The hospitality level of the winery
building is framed with concrete fill over metal decking over
steel beams. The foundation will be a slab-on-grade with drilled
piers below the mezzanine and along the north wall and with
conventional retaining walls along the south, west and east
walls. The building is to be constructed over an underground
tunnel. The bottling building contains a 450sf mezzanine and
a 2,130sf underground storage room/tank room. The roof of the
bottling building will be stick framed with large Glu-Lam beams.
The foundation system is a thickened structural concrete mat
slab with retaining walls as required. Picture is a ACAD screenshot
of Phase I, the bottling building.
|
|
| |
 |
|
 |
Paradigm Winery
Addition to an existing wood framed winery. Project includes
a new wood framed barrel building, fermentation room and two
exterior storage areas. |
|
| |
 |
|
 |
Wooden Valley Winery
A new winery comprised of a 28,000sf first floor, 4,800sf
second floor, 4,200sf roofed portico and a 2,000sf crush pad. |
|
|
| |
|
|
|